
Switch between filing seasons, not during one. Get a full export of clients, contacts, documents and open work before you cancel anything, check the new vendor against the Safeguards Rule requirements the IRS sets out in Publication 4557, run both systems briefly in parallel, and move open jobs by hand rather than hoping an import will catch them.
Key takeaways
- Move in a quiet month. May and June beat February every time.
- Export everything before you cancel. Access usually ends with the subscription.
- The FTC Safeguards Rule expects you to pick vendors who can protect the data, write it into the contract and oversee them.
- Import the client list; move open work by hand. There is less of it than you fear.
- Run both systems in parallel for two weeks, with one of them read-only.
- Tell clients once, briefly, and only about what changes for them: the portal link.
When is it actually worth switching?
Not every complaint about software is a reason to replace it. Most are training problems, configuration problems or one feature nobody set up. Replacing the system resets all of that to zero and costs a month, so the bar should be high.
The reasons that hold up are structural. The product cannot do something central to how you work and the vendor has no plan to add it. The pricing has moved somewhere you cannot follow. You are paying for three tools because the main one does two jobs badly. The firm has changed shape, taking on payroll or a second brand, and the system assumes one of each. Or support has degraded to the point where problems stay open for weeks.
The reasons that do not hold up: a bad month, one feature you saw in a competitor's demo, or a partner who dislikes the colour scheme. Write down the three things the current system cannot do, then ask whether anyone has tried. If you are still choosing, our guide to how to test practice management software against your own deadlines is the better place to start. In practice, about half of software replacements that get discussed turn into configuration projects instead, and the firm ends up ahead.
If the answer really is to switch, the decision after that is timing, and it matters more than the product choice.
What do you need to get out of the old system?
Start the export before you give notice. Most vendors cut access at the end of the subscription, and a firm that cancels first discovers in week three that it needed something it can no longer reach.
- Clients and contacts. Names, emails, phone numbers, addresses, the owner of the relationship, and whatever status or stage field you use.
- Documents. Every client file, in a folder structure you can still understand six months later. This is the big one and the slow one.
- Open work. Jobs, their stage, their due date and who is on them.
- Invoices and payments. At minimum, what is outstanding and what it relates to.
- Signed documents. E-signed returns, engagement letters and authorizations, with whatever certificate or audit record the old system issued.
- Messages. Client correspondence held inside the platform rather than in your email.
- Time records if you bill on them, and anything unbilled.
Take the exports as files you hold, not as a promise from the new vendor that it will fetch them. A comma separated file of clients and a zipped folder of documents will still open in five years.
Retention obligations do not pause for a migration. Whatever your record retention policy says you keep, you still have to be able to produce after the old system is gone.
What does the Safeguards Rule require when you change vendors?
Tax and accounting practices are treated as financial institutions under the Gramm-Leach-Bliley Act, which is why the IRS says every firm must have a written data security plan. Changing software is a change to that plan, not an exception to it.
Three obligations bite directly on a migration. You are expected to select service providers capable of maintaining appropriate safeguards. Your contract with them is expected to require those safeguards. And you are expected to oversee them rather than take the first assurance and file it.
Publication 4557 is the practical starting point, with a checklist a small firm can actually work through. The IRS security pages for tax professionals carry the rest, including the breach reporting duty: covered firms must report certain security events affecting 500 or more people to the FTC, generally within 30 days of discovery. The FTC has been re-evaluating the rule, so check the current text rather than a summary written two years ago.
A short vendor checklist that works: where is the data held, who at the vendor can see it, what happens to it when we leave, is access to our account protected by multi-factor authentication, and what does the contract actually say about all four. Put the answers in your security plan with a date. That record is the difference between having done the work and saying you did.
During the move itself, the export files are the exposure. A zipped folder of 400 clients' tax documents on a laptop is the single most sensitive object your firm will handle all year. Encrypt it, keep it off personal devices, and delete the working copies once the import is verified.
How do you sequence a migration around filing season?
The timing rule is simple: move in the quietest eight weeks you have. For a US tax practice that means May to August, not January to April, and not the fortnight before an extension deadline.
| Week | What happens |
|---|---|
| 1 | Export everything from the old system. Check the exports open and look complete. |
| 2 | Set up the new system: brands, users, roles, job templates, invoice settings. |
| 3 | Import clients and contacts. Fix what the import got wrong while the list is small enough to read. |
| 4 | Load documents. Recreate open jobs by hand. Both systems live, old one read-only. |
| 5 | Team works in the new system only. Old system available for lookups. |
| 6 | Tell clients. Send the new portal links. |
| 7-8 | Settle. Then cancel the old subscription, having kept the exports. |
Two rules save most of the pain. First, one person owns the migration and is not also carrying a full client load that month. Second, the old system goes read-only the moment the new one is live, because two systems both accepting work produces a mess that takes longer to untangle than the migration took.
What do you do about open jobs and part-finished work?
Firms worry about this more than it deserves. Count the genuinely open jobs in a quiet month and the number is usually under forty, even in a practice with four hundred clients. Forty jobs recreated by hand is an afternoon.
What matters is deciding where the line falls. Work that is finished stays in the archive: it does not need to exist as a job in the new system, only as documents you can find. Work that is live gets recreated with its real due date and its real owner. Work that has been sitting untouched for a year is not live, and a migration is an honest moment to close it or ask the client.
A worked example. A firm with 410 clients moving in June found 34 open jobs: 11 extended individual returns, 7 bookkeeping clean-ups, 9 payroll registrations, 4 notice responses and 3 advisory pieces. Recreating them took one person about three hours, including chasing two owners for a realistic due date. The import handled the 410 clients in minutes. The documents took two days, mostly waiting.
Resist the temptation to migrate history into the new system as jobs. You will never look at a closed 2023 job as a record of work. You will look for the 2023 return, which is a document.
How do you tell clients without alarming them?
Most of a migration is invisible to clients. One part is not: the portal. If they have a link, a login or an app, that changes, and silence turns a small change into a support problem in January.
Send one message, late in the process, when the new system genuinely works. Say what is changing for them in the first line, give the new link, say what they need to do, and stop. Do not explain your vendor dispute, do not apologise at length, and do not promise improvements that will take a year.
Something like: from Monday, your documents and forms move to a new secure portal. Here is your link. Nothing you have already sent us is lost, and nothing else about how we work with you changes. If you have trouble signing in, reply to this message and we will sort it out.
Expect a handful of clients to need help signing in, and plan for it rather than being surprised by it. If you move in June, those calls land in June. If you move in February, they land on top of everything else.
One more thing to handle quietly: clients with documents they were partway through uploading. Check that list before the old portal goes read-only, and contact those people individually rather than letting them find a dead link.
What does done look like?
A migration drifts if nobody says when it ends. Write the test in advance and hold yourself to it.
- Every client in the old system exists in the new one, with the right email address.
- You can find any client's last three years of documents in under a minute.
- Every open job exists with an owner and a real due date.
- Outstanding invoices are recorded and chaseable.
- The team has worked a full week in the new system without going back.
- Clients have the new portal link and at least a few have used it.
- The exports are stored somewhere safe, and the security plan has been updated with the new vendor and the date.
When those are all true, cancel the old subscription. Not before, and not six months after, which is the more common failure and the more expensive one.
How Zaquil handles moving in from another system
Zaquil treats the arrival as a step in the product rather than a professional services engagement.
Settings has an Import screen that reads a comma separated export from the system you are leaving. It recognises what TaxDome, Karbon, Canopy, QuickBooks and Xero call their columns, so a file exported this morning usually maps itself, and anything it guesses wrong is a dropdown away. Before writing a single record it shows you the plan: how many clients it would create, how many are already here, which rows it would leave out and why, with the line number from your own spreadsheet, and the first fifteen rows exactly as it has read them. If the file also carries job titles and due dates, it opens those jobs too.
Running it twice is safe. Anyone already on the books is matched on email or name and only has blank fields filled in, so a second pass never duplicates a client or overwrites something your team has already recorded. Every import is written to the audit trail with who ran it and what it did.
From there the setup work is ordinary: brands, users with roles, job templates for the work you repeat, recurring jobs for annual returns and quarterly filings, and a branded client portal for documents, organisers, e-signatures and payment. Multi-factor authentication and the audit trail are part of the evidence your security plan needs about the new vendor. Most firms moving across start from the accounting and tax setup, which arrives configured rather than empty. Plans start at $19 a month with a 14-day free trial, which is long enough to run the import and look at the result before deciding.
Frequently asked questions
When is the best time to switch practice management software?
In your quietest eight weeks. For a US tax practice that usually means late May through August, after the April deadline and before extension season gets busy. For a UK practice it is often June to September, clear of both the January Self Assessment peak and the main accounts filing run. The worst time is any month where a missed deadline has a real consequence, which rules out most of the first quarter.
Should I cancel the old subscription before or after migrating?
After, always. Most vendors end access when the subscription ends, including access to the documents you have not exported yet. Export everything first, confirm the exports open and look complete, finish the import, work in the new system for a full week, and only then cancel. The overlap costs one month of a subscription you were leaving anyway, which is cheap insurance.
Will I lose my client documents when I move?
Not if you export them before you cancel. Documents are the slowest part of any migration and the part most likely to be left until last, which is exactly why it should be first. Take them as files you hold in a folder structure you can read, rather than relying on a transfer between vendors. Keep that archive even after the new system is loaded.
Does the FTC Safeguards Rule apply when I change software vendors?
Yes. Tax and accounting practices are financial institutions under the Gramm-Leach-Bliley Act, so the written security plan the IRS describes in Publication 4557 applies continuously. For vendors specifically, you are expected to select providers capable of maintaining appropriate safeguards, require those safeguards in the contract, and oversee them. Record the checks you made and when, because an undocumented check is hard to evidence later.
How long does a migration actually take?
For a firm of a few hundred clients, plan eight weeks of elapsed time and roughly a week of one person's actual work. The client import is minutes. Documents take days, mostly waiting on uploads. Setting up job templates, roles and recurring work takes a day or two of thought. The remaining time is the parallel period, which is deliberately unhurried because that is what makes it safe.
Should I import historical jobs or only open ones?
Only open ones. Closed jobs are records of work you will never open again as jobs; what you will look for is the document the job produced, and that lives in the document archive. Importing years of closed work clutters the new system, makes reports meaningless for the first year, and takes time you could spend getting the open work right.
What if the export file does not match the new system's fields?
That is the normal case, not the exception, because every vendor names its columns differently. A good importer handles it by letting you map columns yourself and showing you the result before anything is written. What you should avoid is editing the export by hand to force it into shape, because a spreadsheet edited at 11pm is how a client's email address ends up attached to someone else's record.
Do I need to tell clients I am changing software?
Tell them about the part that affects them, which is almost always just the portal link. One short message, sent when the new system genuinely works, naming the change in the first line. They do not need your reasons, your vendor history or a feature list. Expect a few sign-in questions and schedule the move so those calls land in a quiet month.
Can two systems run at the same time?
For a short period, and only if one is read-only. Two live systems both accepting work produce split records, duplicated chasing and jobs nobody can find, and untangling that takes longer than the migration. Set a date when the old system becomes lookup-only, tell the team, and make sure nothing new can be created in it after that point.
What should I check about a new vendor's security?
Where the data is held, who at the vendor can access it, what happens to it when you leave, whether your account can be protected with multi-factor authentication, and what the contract says about each. Ask for the answers in writing, note the date, and keep it with your security plan. Publication 4557 gives a fuller checklist you can work through in an afternoon.
Who should run the migration?
One named person, with their client load reduced for that month. Migrations fail when they are everybody's side project, because the work is sequential and a day lost in week one moves everything. The person does not need to be the most senior; they need to be the one who will actually open the export file and check that row 240 looks right.
What happens to e-signed documents and authorizations?
Export them with whatever certificate or audit record the old system produced, because that evidence belongs to the signing event and cannot be recreated afterwards. Store them with your document archive rather than assuming the new system will reproduce them. Anything still awaiting signature when you move should be chased and completed before the old portal closes, not left to expire quietly.
Is it worth switching at all if the current system mostly works?
Often not. Write down the three things the current system cannot do, then check whether anyone has tried to configure them or asked the vendor. A large share of planned replacements turn out to be training or setup problems, and solving those keeps your history, your client logins and your team's habits intact. Switch when the gap is structural and the vendor has no plan to close it.
Run this part of your business in one place
Zaquil puts every email, document, approval, invoice, call and automation for your accounting and tax setup in a single workspace — set up for US practices on day one.
- Client portal with document requests, organisers, e-signatures and online payment
- Jobs with templates, checklists and recurring work; invoices and unbilled time
- One inbox for email, chat, SMS, WhatsApp and calls across every brand